| Sign In | Join Free | My components-electronic.com |
|
MOQ : 1000m
Delivery Time : 3-4 Weeks
Voltage : 1.5KV DC
SP : 2200253
Certification : RoHS Reach
Insulation : EVI-2
Model Number : IEC 12893
Conductor : Bare Copper Stranded
Price : To be negotiated
Temperature : -40~90℃
Supply Ability : 100km per day
Packing : Packed in rolls or reels
Brand Name : Shineplus
Name : EV Charging Cable
Payment Terms : T/T,L/C,Western Union
Application : EV Charging
Packaging Details : Packed in rolls or reels
Place of Origin : China
Jacket : EVM-1
IEC 62893 2C×16mm2+1C×25mm2+6C×0.75mm2+W EV Charging Cable Bared Copper Stranded with EVI-2 Insulation and EVM-1 Jacket 1.5KV DC
| Construction | |||||
| A:2C×16mm2 | B:1C×25mm2 | C:6C×0.75mm2 | |||
| Conductor | Bare copper stranded | ||||
| Cross section | 16mm2 | 25mm2 | 0.75mm2 | ||
| Construction | 511/0.20mm | 798/0.20mm | 40/0.15mm+Tinsel+ Kevlar | ||
| Strand Dia.(Ref.) | 5.80mm | 7.00mm | 1.30mm | ||
| Insulation | EVI-2 | ||||
| Nom.Thickness | 0.80mm | 1.00mm | 0.40mm | ||
| Min.Thickness | 0.64mm | 0.80mm | 0.32mm | ||
| Insulation Dia. | 7.60±0.30mm | 9.30±0.40mm | 2.20±0.05mm | ||
| Insulation colour | A1.brown A2.blue | yellow/green | 1.white 2.gray 3.orange 4.pink 5.black 6.purple |
||
| Filler | / | / | PP rope | ||
| Tape | / | / | Non woven | ||
| Filler | PP rope | ||||
| Tape | Non woven | ||||
| Assembly | 2C×16mm2+1C×25mm2+(6C×0.75mm2+W)+W | ||||
| Jacket | EVM-1 | ||||
| Nom.Thickness | 1.50mm | ||||
| Min.Thickness | 1.20mm | ||||
| Outer Dia. | 23.30±1.50mm | ||||
| Colour | per request | ||||
Product Description
Application:EV Charging
This Product is applicable for all kinds of electric vehicles,charging piles, power station, charging station.
Product character:
Tensile strength:≥20MPa
Elongation:≥300%
Aged condition:110±1℃×168h
Percent of original tensile strength:±30%
Percent of original elongation: ±30%
VW-1
Technical data
Rated voltage:1.5KV DC
Rated Temperature: -40~90℃
Max.conductor DC resistance(20℃):A:1.21Ω/km B:0.78Ω/km C:26Ω/km
Dielectric Strength AC:7.0kV/5min
Properties
Effectively resist electromaganetic interference
Excellent insulation performance
Extensively Flame resistant

|
|
IEC 62893 EV Charging Cable Bared Copper Stranded With EVI-2 Insulation / EVM-1 Jacket 1.5KV DC Images |