Sign In | Join Free | My components-electronic.com
China Guangdong Shineplus Connection Technology Co.,LTD logo
Guangdong Shineplus Connection Technology Co.,LTD
Professional, Integrity, Green & Win-win
Verified Supplier

1 Years

Home > EV Charging Cable >

IEC 62893 Electric Vehicle Charging Cable With EVI-2 Insulation / EVM-1 Jacket

Guangdong Shineplus Connection Technology Co.,LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

IEC 62893 Electric Vehicle Charging Cable With EVI-2 Insulation / EVM-1 Jacket

  • 1
  • 2

Insulation : EVI-2

Packing : Packed in rolls or reels

Place of Origin : China

Brand Name : Shineplus

Temperature : -40~90℃

Name : EV Charging Cable

Supply Ability : 100km per day

Application : EV-Charging

Delivery Time : 3-4 Weeks

Certification : RoHS Reach

SP : 2200256

Conductor : Bare Copper Stranded

Packaging Details : Packed in rolls or reels

Price : To be negotiated

Payment Terms : T/T,L/C,Western Union

Jacket : EVM-1

Voltage : 1.5KV DC

Model Number : IEC62893

MOQ : 1000m

Contact Now

IEC 62893 2C×70mm2+1C×25mm2+(6C×0.75mm2+W)+W EV Cable with EVI-2 Insulation EVM-1 Jacket

Construction
A:2C×70mm2 B:1C×25mm2 C:6C×0.75mm2
Conductor Bare copper stranded
Cross section 70mm2 25mm2 0.75mm2
Construction 2257/0.20mm 798/0.20mm 40/0.15mm+Tinsel+ Kevlar
Strand Dia.(Ref.) 11.80mm 7.00mm 1.30mm
Insulation EVI-2
Nom.Thickness 1.20mm 1.00mm 0.40mm
Min.Thickness 0.96mm 0.80mm 0.32mm
Insulation Dia. 14.60±0.60mm 9.30±0.40mm 2.20±0.05mm
Insulation colour A1.brown A2.blue yellow/green 1.white 2.gray 3.orange
4.pink 5.black 6.purple
Filler / / PP rope
Tape / / Non woven
Filler PP rope
Tape Non woven
Assembly 2C×35mm2+1C×25mm2+(6C×0.75mm2+W)+W
Jacket EVM-1
Nom.Thickness 2.50mm
Min.Thickness 2.00mm
Outer Dia. 35.50±1.50mm
Colour per request

Product Description
Application:This Product is applicable for all kinds of electric vehicles,charging ppiles, power station, charging station.
Product character:
Tensile strength:≥20MPa Elongation:≥300%
Aged condition:110±1℃×168h
Percent of original tensile strength:±30%
Percent of original elongation: ±30%


Technical data
Rated voltage:1.5KV DC
Rated Temperature: -40-90℃
Max.conductor DC resistance(20℃):A:0.272Ω/km B:0.78Ω/km C:26Ω/km
Dielectric Strength AC: 7.0kV/5min

Properties
Effectively resist electromaganetic interference
Excellent insulation performance
Extensively Flame resistant
Flexible

IEC 62893 Electric Vehicle Charging Cable With EVI-2 Insulation / EVM-1 Jacket

IEC 62893 Electric Vehicle Charging Cable With EVI-2 Insulation / EVM-1 Jacket


Product Tags:

IEC 62893 Electric Vehicle Charging Cable

      

EVI-2 Insulation Electric Vehicle Charging Cable

      

EVM-1 Jacket Electric Vehicle Charging Cable

      
Buy cheap IEC 62893 Electric Vehicle Charging Cable With EVI-2 Insulation / EVM-1 Jacket product

IEC 62893 Electric Vehicle Charging Cable With EVI-2 Insulation / EVM-1 Jacket Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangdong Shineplus Connection Technology Co.,LTD
*Subject:
*Message:
Characters Remaining: (0/3000)